New York County, New YorkInstall / replacement permitReady to fill online

Application for New York City Private Community Sewage Disposal System Permit

Required to construct and operate a private sewage disposal system in a subdivision realty development involving 15 or more dwellings within New York City, including Manhattan.

First page of the New York County, New York Application for New York City Private Community Sewage Disposal System Permit
Preview being prepared. The real form is what gets filled
Jurisdiction
New York County, New York
Fields
191
Includes
Signatures
Fill and submit free

Create a free account to fill this form, sign it and download it ready to file. No card needed.

  • Your answers print onto the health department's own PDF
  • Sign on screen: phone, tablet or laptop
  • Save it and come back to it

Fill it online

Type into the real county form. No printing, no retyping.

The county's own PDF

Your answers print onto the health department's document, not a lookalike.

Download and file

Get the finished PDF and hand it in exactly as they expect it.

What this form asks for

Have these to hand before you start.

  • Step 1: Complete The Following (Included In This Packet)
  • Step 3: Submit Documents And Forms
  • Step 4: After You Submit Your Application
  • Step 5: Access Information And Operating Guidance
  • This Form Is Included In This Packet
  • Email The Completed Form To Vendorinquiry@Oath.Nyc.Gov
  • O
  • It May Take Up To Four (4) Weeks To Obtain Clearance From OATH
  • If You Don’t Have One, You Can Obtain A New Sales Tax Certificate At
  • WHAT YOU NEED TO SUBMIT AT THE LICENSING CENTER
  • These Forms Are Included In This Packet
  • List Only Your Name If Number One Else Will Operate Your Vending Unit
  • Valid Driver's License Or Non Driver's Photo Identification
  • Current Lease Or Mortgage Statement
  • U'S. Driver’s License Or Non Driver’s ID
  • Current U'S. Or Foreign Passport
  • Alien Registration Card Or Naturalization Certificate
  • IDNYC New York City Municipal ID Card (Nyc.Gov/Idnyc)
  • Check Or Money Order Made Out To “NYC DOHMH”
  • The Contract, Lease Or Letter Of Authorization Must Specify
  • Section
  • Instructions
  • Section B
  • Section C

…and 167 more.

Where it goes

Application for Permit must be completed and brought in person to the DCWP Citywide Licensing Center, 42 Broadway Lobby, New York, NY 10004; applications are not accepted by mail. Contact DOHMH Office of Public Health Engineering at phe@health.nyc.gov before submitting.

Filed with phe@health.nyc.gov.

The form is the free part

SepticSync runs the rest of the job too

Filling this permit is free and stays free. What you pay for is everything that happens around it: the filing, the chasing, the paperwork that piles up behind every install.

Free

no card

Enough to get a permit out the door today.

  • 3 forms a month, filled and signed
  • The county's own PDF, not a lookalike
  • Site sketch and on-screen signatures
  • Saved for 6 months
  • Send to the property owner to sign
Start free

A paid plan

from $99/mo

For anyone doing this more than occasionally.

  • Unlimited forms, filed to the county for you
  • Permits, inspections and parcels in one place
  • Scheduling, jobs, customers and invoicing
  • AI diagnostics and failure prediction
  • Your whole crew, with roles and permissions
See plans

14 days of everything, free and without a card.

What a plan actually does

  • Filed for you

    We send the finished form to the health department at the address you set per form, and keep the receipt.

  • Permits tracked

    Every application followed from submission to approval, so nothing sits waiting on someone without you knowing.

  • Scheduling and dispatch

    A drag-and-drop calendar, crews assigned, and a service record written the moment a job is finished.

  • Invoicing and QuickBooks

    Invoice straight from a completed job with labour and materials pulled in, take payment online, sync to QuickBooks.

  • AI diagnostics

    Photograph a tank or field and get cracks, corrosion and root intrusion flagged, with failure risk at 6, 12 and 24 months.

  • Parcels and compliance

    Every property with a permanent record of pumping, inspections, and the paperwork that goes with them, on a map coloured by compliance status.

  • Built for the truck

    Timestamped photos, GPS pins and signatures captured in the field, on a phone, without a signal babysitter.

  • Any form, not just ours

    Upload a PDF, a Word file or a photo of a paper form and it comes back fillable, checked and ready to use.